Skip to main content
Civic Trust Awards
Cody Dock Rolling Bridge

Cody Dock Rolling Bridge

Newham, Greater London

Civic Trust Awards Citation

Cody Dock, nestled along the once-neglected Lea River, has undergone a remarkable transformation into a thriving hub of creativity and production, epitomizing the regeneration spurred by the 2012 Olympic Games in London. 

At the heart of this renaissance is the Cody Dock Rolling Bridge, a small yet impactful marvel of creative engineering that bridges not only the physical gap over the dock mouth but also connects communities and fosters a renewed appreciation for the waterways. The bridge, ingeniously counter-weighted and operated by a hand-cranked winch, is a testament to risk-taking in a risk-averse climate. Its ability to seamlessly accommodate pedestrians and boats demonstrates a thoughtful approach to accessibility, rekindling the area's historical connection to waterways. 

In a post-COVID era, where outdoor spaces have gained newfound importance, the bridge emerges as a symbol of resilience and adaptability. Beyond its functional brilliance, the Cody Dock Rolling Bridge has become a catalyst for community engagement and educational initiatives. The Gasworks Dock Partnership's prior efforts in transforming the dock area into a vibrant creative industries quarter lay the foundation for sustainable redevelopment. The preservation of reedbeds and the influx of wildlife underscore the ecological impact, with local birdwatchers and schools actively participating in the initiative. Collaboration with the University of Westminster has yielded temporary structures for community use, enriching architectural education through live projects with specific brief requirements. The bridge itself, constructed with Corten for durability and carefully weighted for controlled movement, stands not only as a physical link but also as a potential learning tool for future engineers and architects. 

The bridge's design, a labour of love, reflects the dedication and passion of the project team. As improvements to the basin walls continue, the bridge's temporary ramps ensure continued accessibility, emphasizing a commitment to public enjoyment. 

Judges’ Comments: “In its small and specific scope, the Cody Dock Rolling Bridge emerges as a beautifully designed project with undeniable social and community impact, symbolising the transformative power of creative engineering in urban revitalisation.”

Cody Dock Rolling Bridge
Cody Dock Rolling Bridge
Cody Dock Rolling Bridge
Cody Dock Rolling Bridge
Cody Dock Rolling Bridge
Cody Dock Rolling Bridge
Cody Dock Rolling Bridge
Cody Dock Rolling Bridge
Cody Dock Rolling Bridge
Cody Dock Rolling Bridge
Cody Dock Rolling Bridge
Cody Dock Rolling Bridge
Cody Dock Rolling Bridge
Cody Dock Rolling Bridge

Photography Credits & Captions

Cody Dock Rolling Bridge -01.jpg, Credit: Jim Stephenson, Caption: Cody Dock Rolling Bridge Cody Dock Rolling Bridge -02.jpg, Credit: Jim Stephenson, Caption: Cody Dock Rolling Bridge Cody Dock Rolling Bridge -03.jpg, Credit: Guy Archard, Caption: Cody Dock Rolling Bridge Cody Dock Rolling Bridge -04.jpg, Credit: Jim Stephenson, Caption: Cody Dock Rolling Bridge Cody Dock Rolling Bridge -05.jpg, Credit: Jim Stephenson, Caption: Cody Dock Rolling Bridge Cody Dock Rolling Bridge -06.jpg, Credit: Jim Stephenson, Caption: Cody Dock Rolling Bridge Cody Dock Rolling Bridge -07.jpg, Credit: Jim Stephenson, Caption: Cody Dock Rolling Bridge Cody Dock Rolling Bridge -08.jpg, Credit: Jim Stephenson, Caption: Cody Dock Rolling Bridge Cody Dock Rolling Bridge -09.jpg, Credit: Jim Stephenson, Caption: Cody Dock Rolling Bridge Cody Dock Rolling Bridge -10.jpg, Credit: Guy Archard, Caption: Cody Dock Rolling Bridge Cody Dock Rolling Bridge -11.jpg, Credit: Cake Industries, Caption: Cody Dock Bridge fabrication Cody Dock Rolling Bridge -12.jpg, Credit: Cake Industries, Caption: Cody Dock Bridge fabrication Cody Dock Rolling Bridge -13.jpg, Credit: Cake Industries, Caption: Cody Dock Bridge fabrication Cody Dock Rolling Bridge -14.jpg, Credit: Guy Archard, Caption: Cody Dock Rolling Bridge

Overall Result

Highly Commended

Application Type

CTA

Primary Use Class

B2 General industrial

Secondary Use Class

E(c)(iii) Other appropriate services in a commercial, business or service locality

Credits

Structural Engineer

Price & Myers

Architect

Thomas Randall-Page

Main Contractor

Cake Industries

Main Contractor

Gasworks Dock Partnership